Possible fix for CI_SERVER issue in VLS CI #7967
ci.yaml
on: push
Pre-build checks
7m 33s
Matrix: compile
Run fuzz regression tests
11m 59s
Matrix: Run unit tests
Matrix: Sanitizers Test CLN
Matrix: integration-valgrind
Matrix: integration
CI completion
0s
Annotations
12 errors
Test CLN splicing
Process completed with exit code 1.
|
Test CLN clang
The job was canceled because "splicing_compile-gcc_sqli" failed.
|
Test CLN clang
The operation was canceled.
|
Test CLN postgres
The job was canceled because "splicing_compile-gcc_sqli" failed.
|
Test CLN postgres
The operation was canceled.
|
Test CLN liquid
The job was canceled because "splicing_compile-gcc_sqli" failed.
|
Test CLN liquid
The operation was canceled.
|
Test CLN gcc
The job was canceled because "splicing_compile-gcc_sqli" failed.
|
Test CLN gcc
The operation was canceled.
|
Valgrind Test CLN Valgrind (02/10)
Process completed with exit code 1.
|
Valgrind Test CLN Valgrind (09/10)
The job was canceled because "Valgrind__02_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (09/10)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
cln-compile-clang-sanitizers.tar.bz2
Expired
|
163 MB |
|
cln-compile-clang.tar.bz2
Expired
|
110 MB |
|
cln-compile-gcc-O3.tar.bz2
Expired
|
140 MB |
|
cln-compile-gcc.tar.bz2
Expired
|
111 MB |
|