Skip to content

Part 6: final catchup to latest BOLT spec #10128

Part 6: final catchup to latest BOLT spec

Part 6: final catchup to latest BOLT spec #10128

Triggered via pull request July 24, 2024 00:11
Status Failure
Total duration 52m 35s
Artifacts 4

ci.yaml

on: pull_request
Matrix: compile
Run fuzz regression tests
9m 41s
Run fuzz regression tests
Matrix: Run unit tests
Matrix: Sanitizers Test CLN
Matrix: integration-valgrind
Matrix: integration
Matrix: min-btc-support
CI completion
0s
CI completion
Fit to window
Zoom out
Zoom in

Annotations

30 errors
Sanitizers Test CLN (ASan/UBSan (08/10), --test-group=8 --test-group-count=10)
Process completed with exit code 1.
Sanitizers Test CLN (ASan/UBSan (09/10), --test-group=9 --test-group-count=10)
The job was canceled because "ASan_UBSan__08_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (10/10), --test-group=10 --test-group-count=10)
The job was canceled because "ASan_UBSan__08_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (02/10), --test-group=2 --test-group-count=10 -n 1)
The job was canceled because "ASan_UBSan__08_10__--test" failed.
Valgrind Test CLN Valgrind (08/10)
Process completed with exit code 1.
Valgrind Test CLN Valgrind (01/10)
The job was canceled because "Valgrind__08_10__--test-g" failed.
Valgrind Test CLN Valgrind (01/10)
The operation was canceled.
Valgrind Test CLN Valgrind (04/10)
The job was canceled because "Valgrind__08_10__--test-g" failed.
Valgrind Test CLN Valgrind (04/10)
The operation was canceled.
Valgrind Test CLN Valgrind (07/10)
The job was canceled because "Valgrind__08_10__--test-g" failed.
Valgrind Test CLN Valgrind (07/10)
The operation was canceled.
Valgrind Test CLN Valgrind (02/10)
The job was canceled because "Valgrind__08_10__--test-g" failed.
Valgrind Test CLN Valgrind (02/10)
The operation was canceled.
Valgrind Test CLN Valgrind (05/10)
The job was canceled because "Valgrind__08_10__--test-g" failed.
Valgrind Test CLN Valgrind (05/10)
The operation was canceled.
Valgrind Test CLN Valgrind (10/10)
The job was canceled because "Valgrind__08_10__--test-g" failed.
Valgrind Test CLN Valgrind (10/10)
The operation was canceled.
Test CLN liquid
Process completed with exit code 1.
Test CLN gcc
The job was canceled because "liquid_compile-gcc_gcc_li" failed.
Test CLN gcc
The operation was canceled.
Test CLN clang
The job was canceled because "liquid_compile-gcc_gcc_li" failed.
Test CLN clang
The operation was canceled.
Test CLN splicing
The job was canceled because "liquid_compile-gcc_gcc_li" failed.
Test CLN splicing
The operation was canceled.
Test CLN postgres
The job was canceled because "liquid_compile-gcc_gcc_li" failed.
Test CLN postgres
The operation was canceled.
Test minimum supported BTC v25.0 with clang
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
cln-compile-clang-sanitizers.tar.bz2 Expired
169 MB
cln-compile-clang.tar.bz2 Expired
116 MB
cln-compile-gcc-O3.tar.bz2 Expired
143 MB
cln-compile-gcc.tar.bz2 Expired
115 MB