close: Do not attempt a unilateral close when we see another close on-chain #10123
ci.yaml
on: pull_request
Pre-build checks
11m 21s
Matrix: compile
Run fuzz regression tests
9m 10s
Matrix: Run unit tests
Matrix: Sanitizers Test CLN
Matrix: integration-valgrind
Matrix: integration
Matrix: min-btc-support
CI completion
0s
Annotations
52 errors
Sanitizers Test CLN (ASan/UBSan (04/10), --test-group=4 --test-group-count=10)
Process completed with exit code 1.
|
Sanitizers Test CLN (ASan/UBSan (02/10), --test-group=2 --test-group-count=10 -n 1)
The job was canceled because "ASan_UBSan__04_10__--test" failed.
|
Sanitizers Test CLN (ASan/UBSan (02/10), --test-group=2 --test-group-count=10 -n 1)
The operation was canceled.
|
Sanitizers Test CLN (ASan/UBSan (09/10), --test-group=9 --test-group-count=10)
The job was canceled because "ASan_UBSan__04_10__--test" failed.
|
Sanitizers Test CLN (ASan/UBSan (09/10), --test-group=9 --test-group-count=10)
The operation was canceled.
|
Sanitizers Test CLN (ASan/UBSan (10/10), --test-group=10 --test-group-count=10)
The job was canceled because "ASan_UBSan__04_10__--test" failed.
|
Sanitizers Test CLN (ASan/UBSan (10/10), --test-group=10 --test-group-count=10)
The operation was canceled.
|
Sanitizers Test CLN (ASan/UBSan (08/10), --test-group=8 --test-group-count=10)
The job was canceled because "ASan_UBSan__04_10__--test" failed.
|
Sanitizers Test CLN (ASan/UBSan (08/10), --test-group=8 --test-group-count=10)
The operation was canceled.
|
Sanitizers Test CLN (ASan/UBSan (07/10), --test-group=7 --test-group-count=10)
The job was canceled because "ASan_UBSan__04_10__--test" failed.
|
Sanitizers Test CLN (ASan/UBSan (07/10), --test-group=7 --test-group-count=10)
The operation was canceled.
|
Sanitizers Test CLN (ASan/UBSan (01/10), --test-group=1 --test-group-count=10)
The job was canceled because "ASan_UBSan__04_10__--test" failed.
|
Sanitizers Test CLN (ASan/UBSan (01/10), --test-group=1 --test-group-count=10)
The operation was canceled.
|
Sanitizers Test CLN (ASan/UBSan (05/10), --test-group=5 --test-group-count=10)
The job was canceled because "ASan_UBSan__04_10__--test" failed.
|
Sanitizers Test CLN (ASan/UBSan (05/10), --test-group=5 --test-group-count=10)
The operation was canceled.
|
Sanitizers Test CLN (ASan/UBSan (03/10), --test-group=3 --test-group-count=10)
The job was canceled because "ASan_UBSan__04_10__--test" failed.
|
Sanitizers Test CLN (ASan/UBSan (03/10), --test-group=3 --test-group-count=10)
The operation was canceled.
|
Sanitizers Test CLN (ASan/UBSan (06/10), --test-group=6 --test-group-count=10)
The job was canceled because "ASan_UBSan__04_10__--test" failed.
|
Sanitizers Test CLN (ASan/UBSan (06/10), --test-group=6 --test-group-count=10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (04/10)
Process completed with exit code 1.
|
Valgrind Test CLN Valgrind (02/10)
The job was canceled because "Valgrind__04_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (02/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (10/10)
The job was canceled because "Valgrind__04_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (06/10)
The job was canceled because "Valgrind__04_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (10/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (06/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (08/10)
The job was canceled because "Valgrind__04_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (08/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (05/10)
The job was canceled because "Valgrind__04_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (05/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (01/10)
The job was canceled because "Valgrind__04_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (01/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (03/10)
The job was canceled because "Valgrind__04_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (03/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (09/10)
The job was canceled because "Valgrind__04_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (09/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (07/10)
The job was canceled because "Valgrind__04_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (07/10)
The operation was canceled.
|
Test CLN splicing
The job running on runner GitHub Actions 57 has exceeded the maximum execution time of 120 minutes.
|
Test CLN splicing
The operation was canceled.
|
Test minimum supported BTC v25.0 with clang
The job running on runner GitHub Actions 56 has exceeded the maximum execution time of 120 minutes.
|
Test minimum supported BTC v25.0 with clang
The operation was canceled.
|
Test CLN clang
The job running on runner GitHub Actions 27 has exceeded the maximum execution time of 120 minutes.
|
Test CLN clang
The operation was canceled.
|
Test CLN liquid
The job running on runner GitHub Actions 46 has exceeded the maximum execution time of 120 minutes.
|
Test CLN liquid
The operation was canceled.
|
Test CLN dual-fund
The job running on runner GitHub Actions 60 has exceeded the maximum execution time of 120 minutes.
|
Test CLN dual-fund
The operation was canceled.
|
Test CLN gcc
The job running on runner GitHub Actions 49 has exceeded the maximum execution time of 120 minutes.
|
Test CLN gcc
The operation was canceled.
|
Test CLN postgres
The job running on runner GitHub Actions 7 has exceeded the maximum execution time of 120 minutes.
|
Test CLN postgres
The operation was canceled.
|