timefold-scheduler Abstract This project uses Timefold as the FJSP scheduling problem optimizer, which is a derivative of OptaPlanner. Dependencies Timefold Solver: 1.15.0 Logback: 1.5.8 JUnit: 5.10.0 Lombok: 1.18.34 JDK: 21.0.4 Features Model Core Issues and solution Run Execute Main.app