Skip to content

BI-29 : Add Status Check in CI/CD pipeline #28

BI-29 : Add Status Check in CI/CD pipeline

BI-29 : Add Status Check in CI/CD pipeline #28

Workflow file for this run

name: Workflow
on:
pull_request:
types: [opened, reopened, synchronize]
jobs:
build-project: #First Job is to check the code formatting, linting and build the project.
if: github.event.pull_request.draft == false
name: Run Prettier, Lint and Build Checks
runs-on: ubuntu-latest
steps:
- name: Checkout Repository
uses: actions/checkout@v2
- name: Install Node.js
uses: actions/setup-node@v2
with:
node-version: 18
- name: Install Dependencies
run: npm install
- name: Code Formatting Check #Runs Prettier Script
run: npm run prettier
- name: Linting Check #Runs ESLint Script
run: npm run lint
- name: Build #Build the project
run: npm run build
- name: Check Build Status
run: |
if [ $? -eq 0 ]; then
echo "Build successful!πŸŽ‰"
else
echo "Build failed!"
exit 1
fi
chromatic-deployment: #Second Job is to deploy the project to Chromatic
if: github.event.pull_request.draft == false
name: Deploy Storybook to Chromatic
runs-on: ubuntu-latest # Operating System
# Job steps
steps:
- name: Checkout Repository
uses: actions/checkout@v2
with:
fetch-depth: 0 # πŸ‘ˆ Required to retrieve git history
- name: Install dependencies
run: npm install
# πŸ‘‡ Adds Chromatic as a step in the workflow
- name: Publish to Chromatic
uses: chromaui/action@v1
# Chromatic GitHub Action options
with:
# πŸ‘‡ Chromatic projectToken, refer to the manage page to obtain it.
projectToken: ${{ secrets.CHROMATIC_PROJECT_TOKEN }}
check-up-to-date:
name: Check if PR is up to date with the main branch
runs-on: ubuntu-latest
steps:
- name: Check Out Code
uses: actions/checkout@v2
- name: Fetch Main Branch
run: git fetch origin main:refs/remotes/origin/main
- name: Check for Divergence
run: |
if git merge-base --is-ancestor main @
then
echo "Your branch is up to date."
exit 0
else
echo "You need to merge / rebase."
exit 1
fi