Skip to content

Emit a metric when pghoard quits main loop #837

Emit a metric when pghoard quits main loop

Emit a metric when pghoard quits main loop #837

Re-run triggered September 18, 2023 08:48
Status Cancelled
Total duration 2m 10s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

build.yml

on: pull_request
Matrix: lint
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test (3.9)
The job was canceled because "_3_10" failed.
test (3.9)
The operation was canceled.
test (3.8)
The job was canceled because "_3_10" failed.
test (3.8)
The operation was canceled.
test (3.11)
The job was canceled because "_3_10" failed.
test (3.11)
The operation was canceled.
test (3.10)
Process completed with exit code 2.