Skip to content

feature: replace the old parsing strategy and move towards a tree based one #3117

feature: replace the old parsing strategy and move towards a tree based one

feature: replace the old parsing strategy and move towards a tree based one #3117

Status Cancelled
Total duration 12m 45s
Artifacts 4

tests.yml

on: pull_request
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

10 errors and 1 warning
tests (3.11)
Canceling since a higher priority waiting request for 'Test Suite-eliax1996/switch-protobuf-type-validation-from-generating-all-valid-types-to-generate-tree-of-dependencies' exists
tests (3.11)
The operation was canceled.
tests (3.9)
Canceling since a higher priority waiting request for 'Test Suite-eliax1996/switch-protobuf-type-validation-from-generating-all-valid-types-to-generate-tree-of-dependencies' exists
tests (3.9)
The operation was canceled.
tests (3.8)
Canceling since a higher priority waiting request for 'Test Suite-eliax1996/switch-protobuf-type-validation-from-generating-all-valid-types-to-generate-tree-of-dependencies' exists
tests (3.8)
The operation was canceled.
tests (3.10)
Canceling since a higher priority waiting request for 'Test Suite-eliax1996/switch-protobuf-type-validation-from-generating-all-valid-types-to-generate-tree-of-dependencies' exists
tests (3.10)
aborting artifact upload
tests (3.10)
An error was encountered when uploading karapace-integration-test-logs-3.10. There were 194 items that failed to upload.
tests (3.10)
The operation was canceled.
tests (3.10)
Aborting upload for /tmp/ci-logs/kafka/logs/server.log due to failure

Artifacts

Produced during runtime
Name Size
karapace-integration-test-logs-3.10 Expired
54.2 MB
karapace-integration-test-logs-3.11 Expired
146 MB
karapace-integration-test-logs-3.8 Expired
146 MB
karapace-integration-test-logs-3.9 Expired
145 MB