You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
This repository has been archived by the owner on Sep 19, 2024. It is now read-only.
@0x4007 The flow to unassign a dormant contributor from a PR is to send in reminders or follow ups to make sure the collaborator is aware about the fact that the deadline to submit a PR or open a draft has been exceeded. Then if there's no response then the bot goes ahead and unassigns the collaborator. But right now from test on a local instance and a couple of instances I've seen in production the bot doesnt do any follow ups and goes ahead to unassign without warnings.
The text was updated successfully, but these errors were encountered:
Yes this is a known issue that will be addressed in the next version. Thanks for reporting this but maintenance on the first version of the bot is halted unless it's a special circumstance (like something payment related).
Sign up for freeto subscribe to this conversation on GitHub.
Already have an account?
Sign in.
@0x4007 The flow to unassign a dormant contributor from a PR is to send in reminders or follow ups to make sure the collaborator is aware about the fact that the deadline to submit a PR or open a draft has been exceeded. Then if there's no response then the bot goes ahead and unassigns the collaborator. But right now from test on a local instance and a couple of instances I've seen in production the bot doesnt do any follow ups and goes ahead to unassign without warnings.
The text was updated successfully, but these errors were encountered: