Skip to content

chore(deps): lock file maintenance #226

chore(deps): lock file maintenance

chore(deps): lock file maintenance #226

Triggered via push August 1, 2024 00:55
Status Failure
Total duration 30s
Artifacts

test.yml

on: push
Matrix: test_matrix
test_dev
9s
test_dev
Fit to window
Zoom out
Zoom in

Annotations

8 errors
test_matrix (20)
Process completed with exit code 1.
test_matrix (18.17)
Process completed with exit code 1.
test_matrix (20.6.1)
The job was canceled because "_20" failed.
test_matrix (20.6.1)
Process completed with exit code 1.
test_dev
Process completed with exit code 1.
test_matrix (21)
The job was canceled because "_20" failed.
test_matrix (21)
The operation was canceled.
test
Process completed with exit code 1.