I'd like to toggle the project list between a grid based view and a card based design #885
Open
1 task done
Labels
enhancement
New feature or request
stale
triage
An issue that is in discussion to be either scheduled for implepmentation or denied
What are you missing?
(PCT Workshop Feedback)
Currently my projects are shown as individual cards, which take up a lot of space. This makes comparing the value within projects difficult and also hinders me in easily finding my project.
Why do you need a solution?
In my old system i have to manage over 1000 projects. The card based design takes a lot of space which hinders me to get a quick overview for my projects.
Ideas
One possiblity could be to have a toggle button which switches the card design with a standard vaadin grid layout
Code of Conduct
The text was updated successfully, but these errors were encountered: