Currently the only concept of cost we have on remedial actions is to slightly penalize the use of range actions in the MIP (same cost for all psts per angle and same cost for all hvdcs per MW) which are given in the parameters, to avoid using too many psts/hvdc actions for very littly gain on the minimum margin.
Describe the expected behavior
It would be good to have an actual cost specific to each remedial action (not per type), which would be required for instance if we want to properly consider costly remedial actions.
Describe the motivation
Feature will be used for CORE CSA, and could be used to replace dichotomy
Extra Information
No response
The text was updated successfully, but these errors were encountered:
Describe the current behavior
Currently the only concept of cost we have on remedial actions is to slightly penalize the use of range actions in the MIP (same cost for all psts per angle and same cost for all hvdcs per MW) which are given in the parameters, to avoid using too many psts/hvdc actions for very littly gain on the minimum margin.
Describe the expected behavior
It would be good to have an actual cost specific to each remedial action (not per type), which would be required for instance if we want to properly consider costly remedial actions.
Describe the motivation
Feature will be used for CORE CSA, and could be used to replace dichotomy
Extra Information
No response