Add update script
Browse files Browse the repository at this point in the history
Make sure update script of lantern.tasks only triggers if the table exists (async_tasks are enabled)
  • Loading branch information
Ngalstyan4 committed Nov 25, 2024
1 parent 50b97fe commit da7c3b1
Show file tree
Hide file tree
Showing 2 changed files with 60 additions and 0 deletions.
1 change: 1 addition & 0 deletions lantern_hnsw/CMakeLists.txt
Original file line number Diff line number Diff line change
Expand Up @@ -268,6 +268,7 @@ set (_update_files
sql/updates/0.3.4--0.4.0.sql
sql/updates/0.4.0--0.4.1.sql
sql/updates/0.4.1--0.5.0.sql
sql/updates/0.5.0--0.6.0.sql
)

# Generate version information for the binary
Expand Down
59 changes: 59 additions & 0 deletions lantern_hnsw/sql/updates/0.5.0--0.6.0.sql
Original file line number Diff line number Diff line change
@@ -0,0 +1,59 @@
DO $$
BEGIN
IF EXISTS (SELECT 1 FROM information_schema.tables WHERE table_schema = 'lantern' AND table_name = 'tasks') THEN
ALTER TABLE lantern.tasks ADD COLUMN pg_cron_jobid bigint DEFAULT NULL;
END IF;
END $$;
CREATE OR REPLACE FUNCTION _lantern_internal.async_task_finalizer_trigger() RETURNS TRIGGER AS $$
DECLARE
res RECORD;
BEGIN
-- if NEW.status is one of "starting", "running", "sending, "connecting", return
IF NEW.status IN ('starting', 'running', 'sending', 'connecting') THEN
RETURN NEW;
END IF;

IF NEW.status NOT IN ('succeeded', 'failed') THEN
RAISE WARNING 'Lantern Async tasks: Unexpected status %', NEW.status;
END IF;

-- Update pg_cron_jobid on lantern.tasks table before the job is unscheduled
-- This is necessary because under some circumstances jobs continue changing status even after they no longer
-- appear in cron.job. The easiest way to trigger this case is to schedule a multi-statement job
-- where the second statement causes a failure, e.g. async_task('select 1; select haha;')
UPDATE lantern.tasks t SET
pg_cron_jobid = c.jobid
FROM cron.job c
LEFT JOIN cron.job_run_details run
ON c.jobid = run.jobid
WHERE
t.pg_cron_job_name = c.jobname AND
c.jobid = NEW.jobid
-- using returning as a trick to run the unschedule function as a side effect
-- Note: have to unschedule by jobid because of pg_cron#320 https://github.com/citusdata/pg_cron/issues/320
-- Note2: unscheduling happens here since the update below may run multiple times for the same async task
-- and unscheduling same job multiple times is not allowed
-- At least experimentally so far, this update runs once per async task
RETURNING cron.unschedule(NEW.jobid) INTO res;

-- Get the job name from the jobid
-- Call the job finalizer if corresponding job exists BOTH in lantern async tasks AND
-- active cron jobs
UPDATE lantern.tasks t SET
(duration, status, error_message) = (run.end_time - t.started_at, NEW.status,
CASE WHEN NEW.status = 'failed' THEN return_message ELSE NULL END)
FROM cron.job_run_details run
WHERE
t.pg_cron_jobid = NEW.jobid
AND t.pg_cron_jobid = run.jobid;

RETURN NEW;

EXCEPTION
WHEN OTHERS THEN
RAISE WARNING 'Lantern Async tasks: Unknown job failure in % % %', NEW, SQLERRM, SQLSTATE;
PERFORM cron.unschedule(NEW.jobid);
RETURN NEW;
END
$$ LANGUAGE plpgsql;