Skip to content

Update imjoy-rpc-v2.md #1078

Update imjoy-rpc-v2.md

Update imjoy-rpc-v2.md #1078

Triggered via push October 17, 2023 19:45
Status Failure
Total duration 3m 9s
Artifacts

test-python.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

15 errors
build (3.11)
Process completed with exit code 1.
build (3.9)
The job was canceled because "_3_11" failed.
build (3.9)
Event loop is closed
build (3.9)
Event loop is closed
build (3.9)
Event loop is closed
build (3.9)
Event loop is closed
build (3.9)
Event loop is closed
build (3.9)
The operation was canceled.
build (3.10)
The job was canceled because "_3_11" failed.
build (3.10)
The operation was canceled.
build (3.8)
The job was canceled because "_3_11" failed.
build (3.8)
Event loop is closed
build (3.8)
Event loop is closed
build (3.8)
Event loop is closed
build (3.8)
The operation was canceled.