Skip to content

Latest commit

 

History

History
17 lines (15 loc) · 926 Bytes

get-started7_grid-operators.md

File metadata and controls

17 lines (15 loc) · 926 Bytes
layout permalink title titleGreen description tags parent summary image
page
/get-started/grid-operators/
Are you a grid operator wanting to manage local congestion?!
local congestion?!
How to get started with the PowerMatcher
DSO
grid operator
congestion management
get-started
The PowerMatcher is a great tool for managing local congestion points.
feature thumbnail
/images/site/get_started_main.jpg
/images/site/grid_operator.jpg

The PowerMatcher is a great tool for managing local congestion points, we have proven this in various test beds in the Netherlands and Bornhol island. This is also the reason why the two biggest grid operators of the Netherlands: Alliander and Stedin have already joined the FAN alliance.

Please contact the FAN if you want to join the alliance and/or bring the technology to your domain!