Skip to content

Commit

Permalink
Built site for gh-pages
Browse files Browse the repository at this point in the history
  • Loading branch information
Quarto GHA Workflow Runner committed Sep 30, 2024
1 parent 5c9c74c commit 01043a4
Show file tree
Hide file tree
Showing 2 changed files with 1 addition and 15 deletions.
2 changes: 1 addition & 1 deletion .nojekyll
Original file line number Diff line number Diff line change
@@ -1 +1 @@
f55e801d
91d91be8
14 changes: 0 additions & 14 deletions index.html
Original file line number Diff line number Diff line change
Expand Up @@ -186,20 +186,6 @@ <h1 class="title d-none d-lg-block">ecoevo.social-docs</h1>

</header>

<div class="callout-warning callout callout-style-default callout-captioned">
<div class="callout-header d-flex align-content-center">
<div class="callout-icon-container">
<i class="callout-icon"></i>
</div>
<div class="callout-caption-container flex-fill">
Downtime planned
</div>
</div>
<div class="callout-body-container callout-body">
<p>A server migration is planned Monday 2024-09-30 around 10:00 UTC.</p>
<p>Downtime should be expected for a few hours around this time.</p>
</div>
</div>
<div class="callout-note callout callout-style-default callout-captioned">
<div class="callout-header d-flex align-content-center">
<div class="callout-icon-container">
Expand Down

0 comments on commit 01043a4

Please sign in to comment.