You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
The challenge manager should get the option to extend phases of the challenges from the direct portal. Mainly Registration and submission phase. This being a very common use case from TopGear contribute to a large number of request from top gear folks on a daily basis. Having this feature will ease out the dependency on support folks to a greater extent for extending the phases of the challenge as and when required or deemed fit by the challenge managers.
The text was updated successfully, but these errors were encountered:
@coderReview
Extensions only work from Online Review tool, when the phase is open. If the phase closes, there is no way to reopen the phase and extend.
This request in on the same lines of the issue. It would be great if this feature can be built along with the below issue
#488
Description
The challenge manager should get the option to extend phases of the challenges from the direct portal. Mainly Registration and submission phase. This being a very common use case from TopGear contribute to a large number of request from top gear folks on a daily basis. Having this feature will ease out the dependency on support folks to a greater extent for extending the phases of the challenge as and when required or deemed fit by the challenge managers.
The text was updated successfully, but these errors were encountered: