You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
This repository has been archived by the owner on Feb 6, 2024. It is now read-only.
Describe this problem
In the current implementation of CeresMeta, the scheduler's verification of shard version inconsistency will result in the shard being closed. However, due to the backward heartbeat information during the table creation process, there is a probability of version inconsistency, which will lead to the shard being unavailable during the table creation process.
Steps to reproduce
Create table multiple times.
Expected behavior
All tables are created normally.
Additional Information
Because the current design cannot solve this problem, we plan to close the verification of version inconsistency first, and solve it after reconstructing the distributed model of CeresMeta.
The text was updated successfully, but these errors were encountered:
Describe this problem
In the current implementation of CeresMeta, the scheduler's verification of shard version inconsistency will result in the shard being closed. However, due to the backward heartbeat information during the table creation process, there is a probability of version inconsistency, which will lead to the shard being unavailable during the table creation process.
Steps to reproduce
Create table multiple times.
Expected behavior
All tables are created normally.
Additional Information
Because the current design cannot solve this problem, we plan to close the verification of version inconsistency first, and solve it after reconstructing the distributed model of CeresMeta.
The text was updated successfully, but these errors were encountered: