Skip to content

bug fix

bug fix #126

Triggered via push September 24, 2024 05:24
Status Failure
Total duration 28s
Artifacts

ci.yml

on: push
Matrix: run-test
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 2 warnings
run-test (8.2)
Process completed with exit code 2.
run-test (8.0)
The job was canceled because "_8_2" failed.
run-test (8.0)
The operation was canceled.
run-test (latest)
The job was canceled because "_8_2" failed.
run-test (latest)
The operation was canceled.
run-test (8.2)
The following actions uses node12 which is deprecated and will be forced to run on node16: actions/checkout@v2, actions/cache@v2. For more info: https://github.blog/changelog/2023-06-13-github-actions-all-actions-will-run-on-node16-instead-of-node12-by-default/
run-test (8.2)
The following actions use a deprecated Node.js version and will be forced to run on node20: actions/checkout@v2, actions/cache@v2. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/