You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
MC Version: 1.12.2
Mod Version: logisticspipes-0.10.4.49
Modpack: Tekkit SMP
If you setup an EU Power Provider and create a working power network for your LP-System it will not work unless you leave the world and load it again. But even then only the laser beam in the pipes shows up, no power is put into the machine that the IC2 Power Supplier Upgrade is attached to.
I was told that this is unique to EU, the RF part of this system seems to work without problem.
This was both tested with IC2Classic-1.12.2-1.5.11 and industrialcraft-2-2.8.222-ex112, didn't work for either.
Beam not showing up right after setting it up
Beam showing up after relogging
Still no energy in the Macerator even after the beam showed up
The text was updated successfully, but these errors were encountered:
MC Version: 1.12.2
Mod Version: logisticspipes-0.10.4.49
Modpack: Tekkit SMP
If you setup an
EU Power Provider
and create a working power network for your LP-System it will not work unless you leave the world and load it again.But even then only the laser beam in the pipes shows up, no power is put into the machine that the
IC2 Power Supplier Upgrade
is attached to.I was told that this is unique to EU, the RF part of this system seems to work without problem.
This was both tested with IC2Classic-1.12.2-1.5.11 and industrialcraft-2-2.8.222-ex112, didn't work for either.
Beam not showing up right after setting it up
Beam showing up after relogging
Still no energy in the Macerator even after the beam showed up
The text was updated successfully, but these errors were encountered: