You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Replace one or both power supplies in the SG100 or SG1000
Summary
A partner engineer was dispatched under FSO 7639985 with the following action plan:
Need to reseat the NIC on 4 SG1000s.
Physically power down the node.
Remove the top cover.
Remove the affected NIC card.
Reinsert the NIC card.
Place the top cover back on.
Power up the node.
If the reseat does not resolve the port 1 and 2 being down issue we'll proceed with replacing the compute node of the affected nodes
Public issues must not contain sensitive information
This issue contains no sensitive information.
The text was updated successfully, but these errors were encountered:
Page URL
https://docs.netapp.com/us-en/storagegrid-appliances/sg100-1000/replacing-one-or-more-power-supplies-in-services-appliance.html
Page title
Replace one or both power supplies in the SG100 or SG1000
Summary
A partner engineer was dispatched under FSO 7639985 with the following action plan:
Need to reseat the NIC on 4 SG1000s.
If the reseat does not resolve the port 1 and 2 being down issue we'll proceed with replacing the compute node of the affected nodes
Public issues must not contain sensitive information
The text was updated successfully, but these errors were encountered: