You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Hi, when building the distillation tower, I am building with the updated steel scaffolding slabs around the tower. However when I try to form the structure with the engineers hammer, it doesn't work. Also when I look in the engineers manual, it does not recognise when I have the steel scaffold slabs in my inventory.
The text was updated successfully, but these errors were encountered:
I have the same issue however the multi block projector is recognising the top two scaffolding layers but the bottom layer is not recognised and is outlined by a red border
There are indeed 2 of the slabs with the same name... ( i builded the disstilation tower yesterday was an interesting trip to see i had the wrong ones.... ).
Would recommend to rename the steel scaffolding grated slab to something unique instead off haveing 2 the same named ones.
Hi, when building the distillation tower, I am building with the updated steel scaffolding slabs around the tower. However when I try to form the structure with the engineers hammer, it doesn't work. Also when I look in the engineers manual, it does not recognise when I have the steel scaffold slabs in my inventory.
The text was updated successfully, but these errors were encountered: