Skip to content

Cycle Start Checklist

PancakeLegend edited this page Jul 15, 2021 · 21 revisions

Fusion 360

  • Box point is correctly set

  • Spindle speed, feed rate, and stepover values in your setup is appropriate for the tool and material used

Post process

  • Safe retract is set to Clearance Height

  • G-Code includes a G0 Z+10 before the spindle start operation.

  • G-Code includes M5 spindle stop immediately before the M30 end program at the end.

Bessie

  • Ref All Home has been performed since being turned on today

  • Tool is correctly inserted

  • Stock is securely held in place

Mach 3

  • Doors are closed, E-Stop is disengaged

  • Reset is green

  • Feed rate and spindle speed is set to 100%

  • X,Y,Z are zeroed correctly to your box point

  • Air pass has been run to confirm that the machine moves as expected, won't crash into workholding

Start cycle

Clone this wiki locally