Cycle Start Checklist
PancakeLegend edited this page Jul 15, 2021
·
21 revisions
Box point is correctly set
Spindle speed, feed rate, and stepover values in your setup is appropriate for the tool and material used
Safe retract is set to Clearance Height
G-Code includes a G0 Z+10
before the spindle start operation.
G-Code includes M5
spindle stop immediately before the M30
end program at the end.
Tool is correctly inserted
Stock is securely held in place
Doors are closed, E-Stop is disengaged
Reset is green
Feed rate and spindle speed is set to 100%
X,Y,Z are zeroed correctly to your box point
Run an air pass to confirm that the machine moves as expected, won't crash into workholding